We're Here to Help! Call Us at +1 (800) 342-3876

Rock Tred  |  SKU: 12150

Chem-Rock LT-25

$36938
Shipping calculated at checkout.


Size

Safe & Secure Payments.

  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Meta Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Chem-Rock LT-25

Available Sizes
  • 1.5 Gallon Unit – contains two ¾ Gallon BAG-PAKTM Units in a single pail
  • 3 Gallon Unit – contains four ¾ Gallon BAG-PAKTM Units in a single pail
Advantages
  • 100% solids
  • Capable of Low Temperature curing down to 20°F
  • Excellent inter-coat adhesion with other ROCK-TRED coatings
  • High gloss finish
  • Flowable, easy to apply formulation
  • Easy 2:1 mix ratio
  • VOC compliant

Description

CHEM-ROCK LT-25 is a slightly amber / clear, 100% solids, medium viscosity, 2-component epoxy coating designed for low temperature curing down to 25°F. CHEM-ROCK LT-25 is a multiuse primer/body/binder epoxy that can be used as a clear or solid color coating or binder for trowel down systems.

Uses

CHEM-ROCK LT-25 is typically applied between 60-150 square feet per gallon per coat depending upon substrate and project requirements.

Typical Coverage

CHEM-ROCK HV is typically applied between 60-135 square feet per gallon per coat depending upon substrate and project requirements.

Physical Properties

Volume mix ratio 2 to 1 (Resin to Hardener)
Viscosity (mixed) 800 CPS Typica
Solids Content (%) 100 % (ASTM D-2697)
Hardness (ASTM D-2240) 75-85 (Shore D)
VOC Compliant with all US Regulations
Application Temps. 20° – 35° F
Gel Time 2 - 6 minutes @ 75° F
Dry to Touch (recoat with compatible products) 30 - 60 minutes @ 75° F
Through Cure 2 - 3 hours @ 75° F
Open for light traffic 24 hours @ 75° F
Shelf Life 1 Year in unopened units

Limitations & For Best Results

  • Do not thin this product.
  • Do not apply when Humidity exceeds 70% indoors.
  • Do not allow to puddle during application.
  • Allow each coat to dry to 'tack-free' or clear prior to re-coat
  • When re-coating, always apply the next coat within 24 hours of completing the previous coat.
  • When pigmenting this product using lighter colors application at 15 mils or in multiple coats may be required for full hide.
  • This product has very short working time – do not mix multiple batches at the same time.
  • To avoid the material setting too fast, precondition the material to approximately 40° F prior to use.

Product Application

Apply using brush, roller and squeegee ROCK-TRED product test data is based on environmental temperatures of 75° F (24° C). Viscosity and working time are always affected by temperatures above or below that mark. When applying product always consider the ambient, surface, and product temperature at the time and place of installation.

Color and Textures

CHEM-ROCK LT-25 is manufactured in CLEAR (amber) and can be field pigmented using ROCKTRED colorants. Most ROCK-TRED products are available in a wide range of textures using an appropriate aggregate.

Chemical Resistance

Always refer to ROCK-TRED's chemical resistance chart for specific information on each product / system or contact ROCK-TRED directly.

Product Storage

DO NOT allow ROCK-TRED products to freeze. All ROCK-TRED products should be properly stored above the floor on pallets or shelves, and in an area that has a constant minimum temperature of 50°F.

Surface Preparation

Always apply ROCK-TRED products to a clean / sound substrate that is free of laitance, grease, oils, debris, and curing compounds. Concrete substrates should be cured for a minimum of 28 days prior to application of product [except as otherwise noted on the individual Product Data Sheet]. Whenever possible, remove existing coatings and/or flooring systems completely; if complete removal is not possible always perform tests to determine adhesion and compatibility to the existing flooring. Mechanical preparation by means of a shotblasting or diamond grinding machine to a minimum CSP-2 profile followed by application of an appropriate ROCK-TRED primer or base system is the best and recommended installation method for CHEM-ROCK LT-25 applications. If the substrate is not properly prepared and the appropriate profile is not achieved, failure of the product to adhere to the substrate may occur.

Clean Up

Application tools and equipment can be cleaned with soap and water immediately after use, or with solvent once the product has begun to cure.

Disposal

Product containers will contain product residue and must be disposed of properly. Label warnings must be observed at all times. All containers must be disposed in accordance with federal, state, and local regulations.

Important Notice

Always read and acquaint yourself with ROCK-TRED's Product Data Sheet,SDS [safety data sheet], and product labels for each individual product prior to mixing and prior to use. For further assistance, product questions, additional information and/or unexpected or unusual installation conditions – contact your Area Sales Representative or ROCK-TRED directly for recommendations. Kit components are pre-measured for optimal performance. Catalyzation errors due to incorrect mixing in the field voids product warranty.